32265

NCSE-OR-MSRE-1507 Drain Tank, OGS, CPS

Joseph Hack
MSRE Personnel who have never completed this module or 30073 and have duties involving characterization, maintenance or removal of material or components in the DTC, DTP, Off-Gas System, and CPS or work on any lines not isolated from the FDTs/FFT. Additionally, FMs, supervisors and work planners that provide direction to these personnel.
40 Slide Module and Examination Classroom providing information on what is analyzed in the NCSE, credible upsets, and controls or assumptions that are important to protecting the crit incredible determination.
50